The Incinomite Model J83-DS incinerator gas burner features direct main flame spark ignition and solid state electronic flame verification. It is ad
TROUBLE CHARTMake sure the thermostat and operating controls are calling for heat. Defective wiring or looseconnections can simulate the component def
A. With motor running check burner line voltage terminals for 120V as follows:1. Between strip terminals L1 and L2 - 120V: voltage OK.2. Between s
Midco International Inc. 4140 West Victoria Street * Chicago, Illinois 60646tel 773.604.8700 fax 773.604.4070 web www.midco-intl.com email
Part 1 InstallationSpecifications1II Indoor VentilationNo. 1 Waste: Primarily dry material such as paper, rags and wood. Burner normally required onl
Part 1 InstallationPart 1Installation Continued IV Chimney, Vent Connector * and Draft Control*Formerly referred to as Flue Pipe 3 To change the Mou
A suitable Main Gas Pressure Regulator should be installed as shown in Figures 1 or 2Choose a regulator(s) to adjust the available gas pressure to t
Part 1Installation Continued For full input, refer too SPECIFICATIONS, page 2, for minimum gas pressure required. Forreduced capacities, refer to Fi
_________________________________Installation wiring to the burner must conform to local codes, or, in their absence in the UnitedStates the National
VII Initial Start Up / Adjustment Continued10.Remove the input adjuster cap (see Figure 4) and, with the Ignitor and Main Flame on, turn the Main Gas
Ignitor trouble will be evi-denced by failure of main burn-er ignition. It may cause fre-quent Electronic Control lock-out. Check for dirt in the ig
_________________________________The valve is a single function on-off type with automatic closing on current failure. Replaceentire valve if valve fa
Commentaires sur ces manuels